FY14 performance monitoring results are available for ten SEMP objectives:

Overall performance results for Objectives 1-1, 1-2, 2-1, 2-4, 4-1, 5-1 and 5-2 were Green (positive/on track). The overall performance result for Objective 3-1 was Amber (caution/improvement needed), and the result for Objective 2-2 was Red (negative/off track). The FY 2014 Performance Results Summary Table provides an average performance score for each objective. More detailed performance results for the ten SEMP objectives listed above are available here. From a total of 75 metrics with performance criteria, in FY 2014, 69% (52) of quarterly/annual performance results were classified as Green; 13% (10) of results were Amber; and 19% (14) of results were Red. An additional 26 quarterly and annual measures do not have performance criteria but provide quantitative monitoring results to the Oversight Committee.

For each Red performance result, the SEMP Oversight Committee must make a determination as to whether or not a root cause analysis (RCA) will be conducted to identify the underlying causes for the Red results. For the previous fiscal year, there were 12 monitoring tasks with Red performance results and 2 that were selected by the Oversight Committee for completion of an RCA. Both of the RCAs selected by the Oversight Committee were completed during FY14.

SEMP FY 2014
Performance Results:
How Are We Doing?